North of the city to do a good job of flood prevention work

in the flood season this year, too much rain, the day before, Chengbei district held a special meeting to flood control work, in-depth analysis of the difficulties and problems existed in flood control work, further deployment of flood control task, refine the responsibility, strengthen flood control measures, to do "ideology, organization, technology, materials, team five to ensure safety in flood season, flood season, to provide security for the region’s economic and social development and people’s life and property safety.
A is ready. To establish the fundamental interests of the masses in the first place of the ideology, the use of radio, television, Internet and other forms of publicity, the cadres and the masses understand the grim situation of this year’s flood prevention work, to fully grasp the Fang daxun, anti disaster make full mental preparation. Two is to do a good job organizing. According to the needs of the task, the timely adjustment of flood control work organization, continue to implement the district level leadership inspection system, the effective implementation of the chief executive responsibility system and the unit responsibility system, the implementation of the responsibility at all levels, refinement measures to people. Three is to do technical preparation. Further revise and improve and refine the disaster relief plan, to strengthen preventive measures, strengthen supervision and inspection of dangerous sections of the found problems, timely treatment. Strengthen the management of river channels, ditches and existing flood control projects, to ensure the integrity and safety of all types of flood control projects, to ensure the smooth flow of Hong Kong, and constantly improve the ability and level of disaster relief. Four is to do a good job of material reserves. Replenish the availability of sandbags and spades and water pumps and other flood control and disaster relief supplies, to ensure flood control, flood prevention work for be prepared against want, orderly to provide strong material support. Five is to strengthen the team building. Further promote the construction of professional rescue team, give full play to the army, armed police, public security, fire, urban management of the main force of the flood fighting. Strengthen personnel training to ensure that the disaster relief work to achieve a responsive, decisive disposal, strong security, effective rescue, and effectively reduce the disaster losses to a minimum. At the same time, earnestly implement the 24 hours on duty system, requirements of the members of the unit leaders personally took command posts, pay close attention to rainfall, flood development, strengthen inspections for risk discovery efforts, timely reporting, to ensure that government decrees, the flow of information, joint flood control work.

 

Leave a Reply

Your email address will not be published. Required fields are marked *